Welcome
Energy June 2024
Waste June 2024
1 Muharran 1446H
Energy May 2024
Water -May 2024
Waste May 2024
EMGS 3-STAR
INISIATIF TENAGA
Poster Digital 2024
EMGS 2-STAR
Energy April 2024
Water -April 2024
Waste April 2024
World Water Day 2024
Energy March 2024
Water -March 2024
Waste March 2024
Energy Feb 2024
Water - Feb 2024
Waste Feb 2024
Energy Jan 2024
Water - Jan 2024
Waste Jan 2024
PTj according to EAC
EMGS 1-Star
Operasi RPPS - PPN
RPPS
INISIATIF TENAGA
{"visible_panels":"10","width":"2200","height":"300","orientation":"horizontal","panel_distance":"0","max_openedaccordion_size":"80%","open_panel_on":"hover","shadow":"true","autoplay":"true","mouse_wheel":"false"}

GMI 1 > Setting & Infrastructure

37150247164_9a9ab9e59c_k_d

Criteria 1.1: Types of Higher Education Institution

Specialised Higher Education Institution

Criteria 1.2: Climate

Tropical Wet and Dry

Criteria 1.3: Number of Campus Site

Two
Please refer to this document as evidence.

Criteria 1.4: Main Campus Setting

Suburban
Please refer to this document as evidence.

Criteria 1.5: Total Main Campus Area (m²)

2,398,337
Please refer to this document as evidence.

Criteria 1.6: Total Main Campus Ground Floor Area of Buildings (m²)

164,037

Criteria 1.7: Total Main Campus Buildings Area (m²)

392,327

Criteria 1.8: Total Main Campus Smart Building Area (m²)

3,192

Criteria 1.9: Total Parking Area (m²)

14,991

Criteria 1.10: Area on Campus Covered in Forest Vegetation 

20%

Criteria 1.11: Area on Campus Covered in Planted Vegetation  

40%

Criteria 1.12: Total Area on Campus for Water Absorption Besides Forest and Planted Vegetation (m²)

25%

Criteria 1.13: Number of Students 

a. Total Number of Regular Students
17,713
b. Total Number of Online Students
15382

Criteria 1.14: Number of Academic and Administrative Staff  

3000

Criteria 1.15: University Budget for Sustainability Effort  

10%